September 29 Update
September 29th, 2025
Last week, our construction team:
- poured the remaining concrete walls in the SW corner of the project and prepped them for waterproofing,
- installed waterproofing behind the tall walls at the SW corner,
- poured more footings.
This week: The teams plans to pour all of the walls within a designated area, work on the catch basin and storm piping along the north side of the project, and prep for a slab pour in a different area.