November 17 Update
November 17th, 2025
The building is starting to take shape! Last week, our construction team: backfilled in the SW corner, and installed waterproofing in the SW and NE corners; continued install of structural steel in the SE corner; installed joists and sheathing. This week, steel install ...
November 3 Update
November 3rd, 2025
Last week, our construction team: completed pouring on-grade concrete slabs for the project continued structural steel framing worked on wood framing installs Next week, they will be continuing wood framing and steel install as well as trenching for primary power. Look for a steel d...October 20 Update
October 20th, 2025
Last week our construction team:Finished pouring the last of the building's footings and stem walls.Prepped for slabs in certain quadrants with backfill, damp proofing, and reinforcing.Set and backfilled two Seattle City Light vaults.Began setting steel columns. This week, we had a big concrete pou...
October 14 Update
October 14th, 2025
Last week, our construction team:- poured the first slab of the entire project!- formed the last of the future building's footings, ready to be poured- completed more damp-proofing and waterproofing This week: - We'll have a mobile crane onsite Monday and Tuesday for steel install- Concrete ...
October 6 Update
October 6th, 2025
Last week, our construction team: - finished pouring the last of the larger retaining and brace frame walls; - began installing waterproofing along certain retaining walls, as well as footing drains; - completed vapor barrier and wire mesh install. This week: - Slab pour! - Waterproofing the...
September 29 Update
September 29th, 2025
Last week, our construction team:- poured the remaining concrete walls in the SW corner of the project and prepped them for waterproofing, - installed waterproofing behind the tall walls at the SW corner, - poured more footings. This week: The teams plans to pour all of the walls within a de...
September 22 Update
September 22nd, 2025
Last week, our construction team:- stripped all of the walls and footings from the previous week's pour;- backfilled some walls, allowing subcontractors to do rough-in work;- installed below-grade damp-proofing and rigid insulation for perimeter walls in certain areas;- and the electrical vault has...
September 15 Update
September 15th, 2025
Last week, our construction team: - had our first mobile crane onsite, - stripped walls in the north corner, - and continued work forming and pouring footings in different parts of the site This week: Continuing work on footings, and starting form-work for stem walls.
September 5 Update
September 8th, 2025
This week, our construction team:began forming some walls in the SW cornercontinued to move forward with the north side of the site, forming walls and pouring them on Fridaybegan laying out deep brace frame footing in several site areascompleted digging pad footing in other areas.Next week: A concre...
August 29 Update
September 2nd, 2025
This week, our construction team:completed the backfill for the last catch basin on N 150th and Burke Ave,poured more concrete footings,ran the deep underground storm piping under the building footprint,completed the form work for several concrete walls. Next week: Rebar install for walls begins...