12NextPage 1 of 2

Now viewing articles posted in 2025.

  • December 5 Update

    December 8th, 2025


    December 5 Update
    Visible progress on the new buildings has really increased in the last few weeks!  Our construction team reports they've been focused on interior wood framing, as well as continuing slab pours in different areas, and level 2 web joist layout and install as well.   

    Read More

  • November 26 Update

    December 1st, 2025


    November 26 Update
    The team was busy in the short week leading up to Thanksgiving! Last week, our construction team started low roof wood sheathing on parts of the new building. Wall framing is ongoing, and metal decking was laid in preparation for concrete pouring. 

    Read More

  • November 17 Update

    November 17th, 2025


    November 17 Update
    The building is starting to take shape! Last week, our construction team: backfilled in the SW corner, and installed waterproofing in the SW and NE corners; continued install of structural steel in the SE corner; installed joists and sheathing. This week, steel install ...

    Read More

  • November 3 Update

    November 3rd, 2025


    Last week, our construction team: completed pouring on-grade concrete slabs for the project continued structural steel framing worked on wood framing installs Next week, they will be continuing wood framing and steel install as well as trenching for primary power. Look for a steel d...

    Read More

  • October 20 Update

    October 20th, 2025


    October 20 Update
    Last week our construction team:Finished pouring the last of the building's footings and stem walls.Prepped for slabs in certain quadrants with backfill, damp proofing, and reinforcing.Set and backfilled two Seattle City Light vaults.Began setting steel columns. This week, we had a big concrete pou...

    Read More

  • October 14 Update

    October 14th, 2025


    October 14 Update
    Last week, our construction team:- poured the first slab of the entire project!- formed the last of the future building's footings, ready to be poured- completed more damp-proofing and waterproofing   This week:  - We'll have a mobile crane onsite Monday and Tuesday for steel install- Concrete ...

    Read More

  • October 6 Update

    October 6th, 2025


    October 6 Update
    Last week, our construction team: - finished pouring the last of the larger retaining and brace frame walls; - began installing waterproofing along certain retaining walls, as well as footing drains; - completed vapor barrier and wire mesh install. This week:  - Slab pour! - Waterproofing the...

    Read More

  • September 29 Update

    September 29th, 2025


    September 29 Update
    Last week, our construction team:- poured the remaining concrete walls in the SW corner of the project and prepped them for waterproofing, - installed waterproofing behind the tall walls at the SW corner,  - poured more footings.  This week: The teams plans to pour all of the walls within a de...

    Read More

  • September 22 Update

    September 22nd, 2025


    September 22 Update
    Last week, our construction team:- stripped all of the walls and footings from the previous week's pour;- backfilled some walls, allowing subcontractors to do rough-in work;- installed below-grade damp-proofing and rigid insulation for perimeter walls in certain areas;- and the electrical vault has...

    Read More

  • September 15 Update

    September 15th, 2025


    September 15 Update
    Last week, our construction team: - had our first mobile crane onsite, - stripped walls in the north corner, - and continued work forming and pouring footings in different parts of the site   This week: Continuing work on footings, and starting form-work for stem walls. 

    Read More

Archive

12NextPage 1 of 2