May 15 Update

May 18th, 2026


The exterior continues to progress, but there's so much happening inside as well! Updates from our team include:
  • The metal roofing and solatube skylight install for covered classroom is complete.
  • Siding progressing around the site: install, painting.
  • Conduit routing and insulation install for the mechanical room was completed.
  • Interior work includes flooring/carpeting, ceiling trim, wall paneling, and light fixture installs.
  • Precast tread and landing install at the exterior steel stair started this week.
  • The water room buildout started this week.
  • Grading at the NW site is ongoing.
  • All electrical utility trenches were backfilled this week.