March 27 Update
March 30th, 2026
We have siding!
This past week, our construction team shared:
- Roof insulation and vapor barrier install for the metal roof completed
- Painting begun on lap siding at NW corner
- Hot rubber detailing nearly completed on a terrace
- Elevator install begun
- East side concrete retaining walls were poured and waterproofed this week
- Utility work by the SW stair has been backfilled and grading is in progress
And as previously, there is significant ongoing work in different areas of the site on soffit rough-in work and drywall install, flooring install, tile prep and install, and acoustic ceiling tile.